Problem Solvers

  1. Create a study that analyzes the 1-day percent move of the 30-year U.S. Treasury Bond futures contract following all a Nonfarm economic release falling after 1993.

  2. Create a study that analyzes the 1-week move of the front S&P futures contract leading up to all U.S. holidays.